top of page
TEVISA - Termel?rica Viana S.A.
Heavy fuel oil thermelectric power plant based on Viana/ES - Brazil with 174 MW installed capacity and electrically connected in 345 kV, built by W�rtsil� operates in hot standby mode in a availability energy contract providing the required safety to the interconnected brazilian system operation. The power plant operation and maintenance is provided by a O&M contract settled with W�rtsil� Brasil Ltda..
EPC Project Management 2021
bottom of page